Flagship Generation & Distribution
10th of Ramadan

DISTRIBUTION NETWORK – 160 MVA + 150 MVA

Located in the New Industrial Area (المطورين الجنوبية) of 10th of Ramadan City, the project spans over 10 million square meters, divided into five main zones (A, B, C, D, and E) in addition to Zona Franca, A6, West of the City, 710 Feddan, and 64 Feddan. This massive industrial development includes more than 2,500 factories, designed to be supplied by two main substations  S13 and S15.

The S13 Substation Project is a strategic infrastructure milestone in 10th of Ramadan City, recognized as one of Egypt’s most significant and largest industrial zones.

 Through an agreement with the Egyptian Electricity Transmission Company (EETC) and the New Urban Communities Authority (NUCA), Kahraba obtained the right of utilization (usufruct) for the 66/11 kV S13 Substation, with a total capacity of 120 MVA.

This facility enables KAHRABA to supply electricity to over 210 factories, covering an area exceeding 3 million square meters, supporting the region’s rapid industrial expansion. Today, KAHRABA proudly serves more than 800 clients with a total distributed capacity exceeding 400 MVA, and is preparing to connect over 2,000 additional factories in the near future strengthening its role as a leading private power distributor and a key enabler of Egypt’s industrial growth.

Flagship Generation & Distribution
FPI, 6th Of October, Giza

KAHRABA started the Commercial operation of FPI IPP’s: with total installed capacity of 2 MW