Flagship Generation & Distribution
10th of Ramadan
DISTRIBUTION NETWORK – 160 MVA + 150 MVA
Located in the New Industrial Area (المطورين الجنوبية) of 10th of Ramadan City, the project spans over 10 million square meters, divided into five main zones (A, B, C, D, and E) in addition to Zona Franca, A6, West of the City, 710 Feddan, and 64 Feddan. This massive industrial development includes more than 2,500 factories, designed to be supplied by two main substations S13 and S15.
The S13 Substation Project is a strategic infrastructure milestone in 10th of Ramadan City, recognized as one of Egypt’s most significant and largest industrial zones.
Through an agreement with the Egyptian Electricity Transmission Company (EETC) and the New Urban Communities Authority (NUCA), Kahraba obtained the right of utilization (usufruct) for the 66/11 kV S13 Substation, with a total capacity of 120 MVA.
Flagship Generation & Distribution
FPI, 6th Of October, Giza
KAHRABA started the Commercial operation of FPI IPP’s: with total installed capacity of 2 MW